Process Safety Enterprise® (PSE), a cloud-based platform, contains Management of Change (MOC), ensuring compliance with OSHA's PSM standard. This white paper details the key features of PSE, including:
A case study highlights how PSE and the MOC workflow could have helped to prevent this disaster by managing MOC more effectively.
Management of Change (MOC) is crucial to the Occupational Health and Safety Administration (OSHA) Process Safety Management (PSM) 29 CFR 1910.119 standard. This element manages change and the associated hazards in the covered process.
Businesses often encounter challenges in managing change as it encompasses a broad scope, including changes made to raw materials, process technologies, equipment, procedures, or changes impacting the overall organization. Managing these changes demands considerable time and resources. Overlooking the various changes and the potential hazards can introduce risks to the safety of employees, plant assets, the community, and the environment. Moreover, an accident could lead to production interruptions.
An effective MOC process should include the technical basis for the change, the safety and health impacts of the change, a description of the change, and the identification of temporary changes. Additional requirements include identifying changes to Process Safety Information and Operating Procedures and ensuring training has been provided before the change is implemented.
To download our resources, you must become a registered site user. After you register, you will receive an email with a login username and password.